Driverlink Training

One of our Solar Power Projects

Project Purpose

This installation is part of a strategy for the business to go greener and become as self-sufficient as possible by reducing their monthly business costs. Estimated CO2 saving is calculated at 8.60T per annum with a 5 year payback period on their initial investment.

CO2 Emissions Saved

35 kt (Kiloton)

Project Location

Skelmersdale

System Size

44Wp plus 10kWh of battery storage

Equipment

Products Used

  • Solax Inverter
  • Solax Triple Power Battery Storage System
  • Longi Solar Panels
  • Van Der Valk Mounting System
Scroll to Top