In this case study, we showcase our annual inspection project conducted for a client with 43 healthcare facilities across the UK. The objective of this project was to ensure the optimal performance and compliance of existing Solar PV systems while providing valuable insights for our client’s decision-making process.

Project Details:

Project Objectives: The primary objectives of this project were as follows:

  1. Performance Assessment: Evaluate the current performance of each Solar PV system to identify any inefficiencies or issues affecting energy generation.
  2. Compliance Check: Ensure that the systems comply with the latest wiring regulations, with a focus on equipment labeling and containment arrangements.
  3. Remedial Recommendations: Provide detailed reports on any remedial works required to enhance system performance and compliance.
  4. Efficient Delivery: Execute the inspections within a 4-week period to ensure all systems continued to produce energy during peak summer months.

Results: E-merge Renewables successfully completed the annual inspection of 43 healthcare facilities across the UK, providing our client with comprehensive insights and actionable recommendations. Here are the key results:

  1. Performance Enhancement: Through string tests and inverter thermal imaging reporting, we identified and addressed performance issues in several Solar PV systems. These optimisations led to increased energy generation and reduced system downtime.
  2. Compliance Assurance: Our team ensured that all systems adhered to the latest wiring regulations. Correct labeling of equipment and containment arrangements were verified, guaranteeing the safety and efficiency of each system.
  3. Remedial Work: Detailed recommendation reports were delivered to the client, outlining specific remedial actions required to further improve system performance and compliance. These recommendations enabled the client to prioritise and plan necessary upgrades.
  4. Efficient Turnaround: Despite the scale of the project, our team executed the inspections within a 4-week period, ensuring that all systems continued to operate efficiently during the height of the summer period. This efficient delivery minimised disruptions and revenue losses for our client.

Conclusion:
e-merge Renewables’ annual inspection of 43 healthcare facilities with existing Solar PV systems demonstrates our commitment to enhancing renewable energy solutions. By optimising system performance and ensuring compliance with industry standards, we helped our client maximise their energy generation and maintain operational efficiency. Our efficient turnaround time ensured minimal disruptions, and our detailed recommendation reports empowered the client to make informed decisions about necessary remedial works. This project showcases our expertise in the field of renewable energy and our dedication to providing valuable solutions to our clients in the healthcare sector.

Get in touch